ButovaS_P20-1B

ButovaS_P20-1B - Name SvetlanaButova Section Date 3/12/2009...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
1054 Name Svetlana Butova Problem 20-1B Section  Date 3/12/2009 Lowry Manufacturing (a) 1 525,000 / 375,000 =140% 1 2 2 3 3 4 4 5 5 (b), (d), and (e)                                                        Job Cost Sheets   JOB NO. 25   JOB NO. 26 Manu- Manu- Direct Direct facturing Direct Direct facturing Date Materials Labor Overhead Date Materials Labor Overhead 1-Jan 30,000 15,000 20,000 1-Jan 24,000 16,000 22,400 8,000 10,000 14,000 38,000 25,000 34,000   Cost of completed job    Cost of completed job  Direct materials 38,000 Direct materials 24,000 Direct labor 25,000 Direct labor 16,000 Manufacturing overhead 34,000 Manufacturing overhead 22,400 Total 97,000 Total 62,400 JOB NO. 27 Manu- Direct Direct facturing Date Materials Labor Overhead 1-Jan 21,000 19,000 26,600
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
1055 Name Svetlana Butova Problem 20-1B Continued Section Date 3/12/2009 Lowry Manufacturing Account Titles Debit Credit
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/11/2011 for the course ACC 101 taught by Professor Corolinsky during the Spring '11 term at SUNY Albany.

Page1 / 5

ButovaS_P20-1B - Name SvetlanaButova Section Date 3/12/2009...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online