ButovaS_P25-1A

ButovaS_P25-1A - Name SvetlanaButova Section Date...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1277 Name Svetlana Butova Problem 25-1A Section Date Putnam Corporation F U 1 Total materials variance: 1 2 (5,130 x 9.49) - (4,950 x 9.10) = 2 3 $48,683.70     - $45,045          = 3,638.70 U 3 4 4 5 Materials price variance: 5 6 (5,130 x 9.49) - (5,130 x 9.10) 6 7 $48,683.70     - $46,683         =  2,000.70 U 7 8 8 9 Materials quantity variance: 9 10 (5,130 x 9.10) - (4,950 x 9.10) = 10 11 $46,683          - $45,045          = 1,638 U 11 12 12 13 Total labor variance: 13 14 (7,000 x 16.25) - (7,425 x 15,60) 14 15 113,750 $115,830  2,080 F 15 16 16 17 Labor price variance:
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

ButovaS_P25-1A - Name SvetlanaButova Section Date...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online