10-3A_22e - = 2009 x = b Units-of-production method = per hour 2006 = 2007 = 2008 = 2009 = c Double-declining-balance method 2006 x x = 2007

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Problem 10-3A Name: Section: Enter the appropriate amounts in the shaded cells below. Some cells will complete themselves. A red asterisk (*) will appear below an incorrect amount. a. Straight-line method: 2006: [( - ) ÷ ] x = 2007: ( - ) ÷ = 2008:
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: (-) ÷ = 2009: (-) ÷ ] x = b. Units-of-production method: (-) ÷ = per hour 2006: @ = 2007: @ = 2008: @ = 2009: @ = c. Double-declining-balance method: 2006: x x = 2007: (-) x = 2008: (-) x = 2009: (-) -=...
View Full Document

This note was uploaded on 03/12/2011 for the course ACCT 2011 taught by Professor Field during the Fall '09 term at University of Minnesota Morris.

Ask a homework question - tutors are online