23-16_22e - Less: Standard hours Idle capacity Fixed...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Exercise 23-16 Name: Section: Enter the appropriate amount in the shaded cells below. A red asterisk (*) will appear to the right of an incorrect amount in the outlined cells. a. Controllable variance: Actual variable factory overhead Standard variable factory overhead at actual production: Standard hours at actual production Variable factory overhead rate x Standard variable factory overhead Controllable variance - b. Volume variance: Volume at 100% of normal capacity
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Less: Standard hours Idle capacity Fixed overhead rate x Volume variance -Total factory overhead cost vaiance -Alternative Computation of Overhead Variances: Factory Overhead Actual Costs Applied Costs Balance Budgeted Factory Actual Factory Overhead for Amount Ap Overhead Produced Variable cost Fixed cost Total Controllable Volume Variance Variance Total factory overhead cost variance pplied Factory Overhead...
View Full Document

Page1 / 3

23-16_22e - Less: Standard hours Idle capacity Fixed...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online