Check_List[1][1]

Check_List[1][1] - New System 3.5.1. 1 New Context Level...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Check List - Phase 3 Item # Item Page # Member Time Comments 3.1 Revision of Phase 2 3.2 Checklist ME 30 minutes Went together well 3.3 PERT chart AK 2 hours Easily adapted from phase 2 Existing System 3.4.1. 1 Physical DFD ME/GF 45 minutes Took a lot of time 3.4.1. 2 Context Level Diagram ME/GF 30 minutes Fairly simplistic 3.4.1. 3 Logical (level 0 to N) ME/GF 8 hours A lot of work and complex 3.4.2. 1 Entity ERD JW 55 minutes Went together well 3.4.2. 2 Key Based ERD JW 45 minutes Easily constructed 3.4.2. 3 Fully Attributed ERD JW 1.5 hours Attributes took some time 3.4.2. 4 Fully Described ERD JW 1.5 hours Descriptions took time 3.4.3 Logic Models AK 1 hour Most unclear part of phase 3
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: New System 3.5.1. 1 New Context Level DFD ME/GF 30 minutes No comment 3.5.1. 2 New Logical DFD 0-n ME/GF 6 hours Took a lot of time but went together well 3.5.2. 1 Entity ERD JW 45 minutes No changes 3.5.2. 2 Key Based ERD JW 1 hour No changes 3.5.2. 3 Fully Attributed ERD JW 1 hour Different attributes due to new technology 3.5.2. 4 Fully Described ERD JW 1.5 hours No changes 3.6 Meeting Agendas & Notes IH 1 hour No comment available 3.7 Individual Summary ALL 30 minutes Same as phase 2 3.8 Member Confirmation ME 10 minutes No comment...
View Full Document

Page1 / 2

Check_List[1][1] - New System 3.5.1. 1 New Context Level...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online