Chapter 20 MULTIPLE CHOICE 1. What is one activity that is not one of the responsibilities of accountants to help keep a project on track? a) ensuring that the project is on schedule b) evaluating and measuring benefits c) helping programmers write code d) monitoring costs 2. Developing a general framework for implementing user requirements and solving problems identified in the analysis phase occurs in which phase of the SDLC? a) conceptual systems design b) implementation and conversion c) operations and maintenance . d) physical design 3. Who is responsible for identifying and evaluating a variety of design alternatives? a) design team b) implementation committee c) steering committee d) systems analysts 4. Who is responsible for evaluating the design alternatives and selecting the one that best meets the organization's needs? a) design team b) implementation committee c) steering committee d) systems analysts 5. Which of the following lists represent the sequence of elements in developing the conceptual design specifications? a) input, data storage, processing procedures and operations, and output b) input, output, data storage, and processing procedures and operations c) output, data storage, input, and processing procedures and operations d) processing procedures and operations, input, data storage, and output 6. The project team wants to find the most efficient way to collect data in order to prepare a report on sales per store. Which element in design specifications will deal with the decision? a) data collection b) input c) output d) processing procedures 7. One of the purposes of the __________ is to guide physical systems design activities. a) conceptual systems design report b) physical systems design report
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
c) program design d) systems analysis report 8. The conceptual design phase is the second phase in the systems design life cycle. There are several steps in this phase. Which step listed below is not a valid step made in the second phase of the SDLC? a) evaluate design alternatives b) physical systems design c) prepare a conceptual systems design report d) prepare design specifications 9. A part of the conceptual design phase is the evaluation of design alternatives. The design team should identify a variety of design alternatives and evaluate them based on several standards. Who is responsible for approving the final design that best meets the organization's needs? a) IS management b) the end-users of the system c) the steering committee d) the system analyst design team 10. Once a design alternative has been chosen, the project team is responsible for the development of several conceptual design elements. A decision about how often to produce a certain report falls under the category of which design element? a)
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/21/2011 for the course ECON 202085 taught by Professor Mohammad during the Spring '11 term at University of Jordan.

Page1 / 16

Test Bank Ch20 - Chapter 20 MULTIPLE CHOICE 1 What is one...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online