Final TOR WPC PreFS

Final TOR WPC PreFS - REPUBLIC OF INDONESIA MINISTRY FOR...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: REPUBLIC OF INDONESIA MINISTRY FOR NATIONAL DEVELOPMENT PLANNING/ NATIONAL DEVELOPMENT PLANNING AGENCY TERMS OF REFERENCE PRE-FEASIBILITY STUDY FOR SOUTH CIMAHI WATER POLLUTION CONTROL PROJECT INFRASTRUCTURE REFORM SECTOR DEVELOPMENT PROJECT ADB LOAN 2264 - INO (SF) OCTOBER 2010 TERMS OF REFERENCE PRE-FEASIBILITY STUDY FOR SOUTH CIMAHI WATER POLLUTION CONTROL PROJECT TABLE OF CONTENTS 1 OBJECTIVES AND PURPOSE OF THE ASSIGNMENT ............................................................................ 5 1.1 ROLE OF BAPPENAS AND THE PDF ..........................................................................................................5 1.2 REQUEST FROM THE GOVERNMENT CONTRACTING AGENCY (GCA) ..............................................................5 1.3 ELIGIBILITY FOR FOLLOW-ON WORK .......................................................................................................5 1.4 BACKGROUND ....................................................................................................................................6 1.5 PROJECT RATIONALE ............................................................................................................................7 1.6 PROJECT DESCRIPTION .........................................................................................................................8 Physical Conditions in the Project Area ...................................................................................................8 Existing Water Pollution Control Services ...............................................................................................9 Technical Specification ..........................................................................................................................10 Wastewater Production Estimates ................................................................................................................... 10 The Proposed Works ........................................................................................................................................ 11 1.7 SITE ENABLEMENT .............................................................................................................................11 1.8 OBJECTIVES OF THE ASSIGNMENT .........................................................................................................12 2 SCOPE OF WORK ............................................................................................................................ 13 2.1 OVERVIEW .......................................................................................................................................13 2.2 STAGE 1: PREPARATION OF THE OUTLINE BUSINESS CASE ..................................................................13 Task 1: GCA and Local Industries Commitment and Capacity Assessment ............................................... 13 Task 2: Preliminary Legal Review .............................................................................................................. 14 Preliminary Legal Review ....
View Full Document

This note was uploaded on 03/29/2011 for the course ACC 1 taught by Professor Coba during the Spring '11 term at Universitas Indonesia.

Page1 / 27

Final TOR WPC PreFS - REPUBLIC OF INDONESIA MINISTRY FOR...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online