Adapting IPD to Lotek SJ

Adapting IPD to Lotek SJ - 2/18/2011 History/Background...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
2/18/2011 1 History/Background Differences Stages to Standard Effort/Ownership Lotek Marine In-House Design Engineering acoustic/marine GPS Archival Tags Designed outside, did not involve local Design Engineering Lotek Wireless (merge) Continued relationship w/CEFAS, CDI, NMT Prototype/test support to acoustic subfamily LAT First Lotek only design Ratio of Design/Ops Engineering reversed
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2/18/2011 2 Regular status meetings with key stakeholders: Engineering Ops Product Management (Leszek) .. sometimes Design Reviews Product Readiness Reviews “Planning” Focus Engineering Operations Orientation: Explorative Exploitive Learn: By doing Before doing Knowledge: Tacit Explicit Outcomes: Unpredictable Predictable Focus: Short term Long term “Differences” are often a source of conflict.
Background image of page 2
2/18/2011 3 “An organization that engages exclusively in exploration will ordinarily suffer from the
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/29/2011 for the course ENGR 9397 taught by Professor Susanhunt during the Winter '11 term at Memorial University.

Page1 / 5

Adapting IPD to Lotek SJ - 2/18/2011 History/Background...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online