Formato para PERT-CPM - Actividad (i,j) Duracin Dij Holgura...

Info iconThis preview shows pages 1–7. Sign up to view the full content.

View Full Document Right Arrow Icon
MÁS PRÓXIMO MÁS TARDÍO TiPj Inicio Terminación Inicio Terminación TIPi TTij ITij TTTj Actividad (i,j) Duración Dij Holgura Total (Htij)
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 6
Background image of page 7
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/29/2011 for the course OPERATIV 999 taught by Professor Nf during the Spring '11 term at Universidad de Carabobo.

Page1 / 7

Formato para PERT-CPM - Actividad (i,j) Duracin Dij Holgura...

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online