data; d param p_city := PITT ; p set D_CITY := NE SE ; set W_CITY := BOS EWR BWI ATL MCO ; s set DW_LINKS := (NE,BOS) (NE,EWR) (NE,BWI) (SE,EWR) (SE,BWI) (SE,ATL) (SE,MCO); param p_supply := 450 ; p param w_demand := BOS 90,
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: EWR 120, BWI 120, ATL 70, MCO 50; param: cost capacity := PITT NE 2.5 250 PITT SE 3.5 250 NE BOS 1.7 100 NE EWR 0.7 100 NE BWI 1.3 100 SE EWR 1.3 100 SE BWI 0.8 100 SE ATL 0.2 100 SE MCO 2.1 100 ;...