Throughput Flowcharts

Throughput Flowcharts - 1 Min. 45 Sec. Total Throughput...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Purchase Materials Need More Materials Folding Add Stability Flaps Add Stabilizer Label/Logo Finished Product Stabilize 45 Seconds 45 Seconds 15 Seconds 15 Seconds 2 Minutes 15 Seconds No Yes No Yes Total Throughput Time: 4 Min. 15 Seconds Run #1 All Materials Purchased Stable Flight?
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Purchase Materials Need More Materials Design Folding Add Stability Flaps Add Stabilizer Wire Finished Product Stabilize 20 Seconds 15 Seconds 15 Seconds 2 Minutes 25 Seconds No Yes No Yes Label/Logo
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1 Min. 45 Sec. Total Throughput Time: 5 Min Run #2 All Materials Purchased Stable Flight? Purchase Materials Need More Materials Folding Add Stabilizer Wire & Stability Flaps Logo Finished Product Refold & Stabilize 20 Seconds 20 Seconds 2 Min. 45 Sec. 1 Min. 15 Sec. No Yes No Yes 1 Min. 20 Sec. Run #3 Total Throughput Time: 6 Minutes Stable Flight? All Materials Purchased...
View Full Document

Page1 / 3

Throughput Flowcharts - 1 Min. 45 Sec. Total Throughput...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online