{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

Production and Costs

Production and Costs - 1428.6 7619.0 23 30000 212000 242000...

Info icon This preview shows pages 1–8. Sign up to view the full content.

View Full Document Right Arrow Icon
Variable Input Total Product Marginal Product Average Product (Labor) (Buildings Demolished) TP MP AP 0 0 0 1 1 1 1 2 3 2 1.5 3 6 3 2 4 11 5 2.75 5 17 6 3.4 6 21 4 3.5 7 23 2 3.29 8 24 1 3 9 23 -1 2.56 10 20 -3 2 MP per TP per d
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
1 2 3 4 5 6 7 8 9 10 11 -4 -2 0 2 4 6 8 MP AP Workers day 1 2 3 4 5 6 7 8 9 10 11 0 5 10 15 20 25 30 TP Workers day
Image of page 2
Average Average Output Fixed Cost Variable Cost Total Cost Marginal Cost Fixed Cost Variable Cost Films FC+VC ΔTC/ΔQ FC/Q VC/Q FC VC TC MC AFC AVC 0 30000 0 30000 1 30000 30000 60000 30000 30000 30000 3 30000 52000 82000 11000 10000 17333.33 6 30000 72000 102000 6666.67 5000.0 12000 11 30000 95000 125000 4600 2727.3 8636.4 17 30000 123000 153000 4666.67 1765 7235.29 21 30000 160000 190000 9250
Image of page 3

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 4
Image of page 5

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 6
Image of page 7

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 8
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1428.6 7619.0 23 30000 212000 242000 26000 1304.3 9217.4 24 30000 287000 317000 75000 1250.0 11958.3 Average Total Cost TC/Q ATC 60000 27333.33 17000 11363.6 9000 9047.6 10521.7 13208.3 1 2 3 4 5 6 10000 20000 30000 40000 50000 60000 70000 80000 Output per period Cost per period 1 2 3 4 5 6 50000 100000 150000 200000 250000 300000 350000 Output per period Cost per period 7 8 9 MC AFC AVC ATC 7 8 9 FC VC TC...
View Full Document

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern