MRP Problem A wheelbarrow requires two handlebars and one wheel assembly (among other parts). Each wheel assembly requires one tire and two bearings. The Master Production Schedule for Wheelbarrow is as follows: Master Production Schedule for Wheelbarrow 1 2 3 4 5 6 7 8 9 50 40 60 40 50 60 30 60 50 The partial inventory records file is given as follows: _______________________________________________________________________ _ Item Lot-sizing Leadtime On-hand Scheduled Name Rule (Weeks) (PD) Receipts Handlebars EOQ = 300 2 weeks 100 300 in Wk 2 Wheel Lot for Lot 3 weeks 220 - Assemblies Tires EOQ = 80 1 Week 50 - Bearings POQ = 2 weeks 2 weeks 150 - Assignment: 1. Develop a partial product structure diagram based on the information provided above.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 2. Develop MRP tables for the items shown in the above table for the lotsizing rules indicated in column 2 of the table. Answer: Product Structure Diagram: H a n d l e B a r ( 2 ) L e a d t i m e = 2 W e e k s T i r e L e a d t i m e = 1 w e e k s B e a r i n g s ( 2 ) L e a d t i m e = 2 w e e k s W h e e l A s s e m b l y ( 1 ) L e a d t i m e = 3 w e e k s W h e e l B a r r o w Note In order to provide you more exhaustive practice, I will deviate from the assigned rules and data....
View Full Document

Page1 / 2

MRP_wheelbarrow - 2. Develop MRP tables for the items shown...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online