MRPWheelbarrowSol

MRPWheelbarrowSol - PD 1 2 3 4 5 6 7 8 9 Gross Req 30 60 50...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
The Wheelbarrow Problem Master Production Schedule for Wheelbarrow PD 1 2 3 4 5 6 7 8 9 50 40 60 40 50 60 30 60 50 Lotsizing Rule: L4L Item = wheelbarrow Leadtime = 0 weeks Level = 0 PD 1 2 3 4 5 6 7 8 9 Gross Requirements 50 40 60 40 50 60 30 60 50 Scheduled Reciepts 0 0 0 0 0 0 0 0 0 Projected on-hand 0 0 0 0 0 0 0 0 0 0 Net Requirements 50 40 60 40 50 60 30 60 50 Planned Order Receipts 50 40 60 40 50 60 30 60 50 Planned Order Releases 50 40 60 40 50 60 30 60 50 Lotsizing Rule EOQ = 300 Item = Handle Bar Leadtime = 2 weeks Level = 1 PD 1 2 3 4 5 6 7 8 9 Gross Requirements 100 80 120 80 100 120 60 120 100 Scheduled Reciepts 0 300 0 0 0 0 0 0 0 Projected on-hand 100 0 220 100 20 220 100 40 220 120 Net Requirements 0 0 0 0 80 0 0 80 0 Planned Order Receipts 0 0 0 0 300 0 0 300 0 Planned Order Releases 0 0 300 0 0 300 0 ? ? Lotsizing Rule = Lot For Lot Wheel Asembly Leadtime = 3 Weeks Level = 1 PD 1 2 3 4 5 6 7 8 9 Gross Requirements 50 40 60 40 50 60 30 60 50 Scheduled Reciepts 0 0 0 0 0 0 0 0 0 Projected on-hand 220 170 130 70 30 0 0 0 0 0 Net Requirements 0 0 0 0 20 60 30 60 50 Planned Order Receipts 0 0 0 0 20 60 30 60 50 Planned Order Releases 0 20 60 30 60 50 ? ? ? Lotsizing Rule EOQ = 80 Item = Tires Leadtime = 1 wk2 Level = 2
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: PD 1 2 3 4 5 6 7 8 9 Gross Requirements 20 60 30 60 50 ? ? ? Scheduled Reciepts Projected on-hand 50 50 30 50 20 40 70 ? ? ? Net Requirements 30 40 10 ? ? ? Planned Order Receipts 80 80 80 ? ? ? Planned Order Releases 80 80 80 ? ? ? ? Lotsizing Rule POQ = 2 Wks Item = Bearings Leadtime = 2 Wks Level = 2 PD 1 2 3 4 5 6 7 8 9 Gross Requirements 40 120 60 120 100 ? ? ? Scheduled Reciepts ? ? ? Projected on-hand 150 150 110 60 100 ? ? ? Net Requirements 10 120 ? ? ? Planned Order Receipts 70 220 ? ? ? Planned Order Releases 70 220 ? ? ? ? ?...
View Full Document

This note was uploaded on 04/11/2011 for the course FIN 322 taught by Professor Gillette during the Winter '07 term at Grand Valley State.

Ask a homework question - tutors are online