252 Program ManagementMod 4 Take 11. Which schedule duration estimating method uses statistical relationships determined from historical data to calculate the estimate for certain tasks? 4.10ParametricSingle PointAnalogousThree Point
2. Prior to using the 14-Point Schedule Metrics, the total number of tasks with detail level work (i.e., lowest level discrete tasks) needs to be calculated. This describes which of the following data types? 4.8
3. What is the difference between a summary schedule and a detailed schedule?
4. In a Gantt chart, which of the following is signified as a solid bar with a striped bar below it?SummaryNon-criticalCriticalSummary Task, In Progress5, The detailed tasks required to be completed and identified in the time-based Integrated Master Schedule (IMS) are directly linked to what element of the event-based Integrated Master Plan (IMP)?CriteriaAccomplishmentEventAssignment
6. Which of the following are advantages of network diagrams?