Evaluation new 2011 - 20 pts 170,000 25 pts 165,000 30 pts...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Evaluation 1. Design template was built under $180,000. Initial_______ 10 pts ______ 2. Your design is symmetric and appealing to the eye. 10 pts ______ 3. Design was an original idea. 5 pts ______ 4. Bridge Cost (Your OWN design) Under 190,000 5 pts 185,000 10 pts 180,000 15 pts 175,000
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 20 pts 170,000 25 pts 165,000 30 pts ______ 5. Bridge was printed out, stapled to the back of evaluation, and turned in. 5pts ______ 6. Student Participation Grade 10 Pts ______ Effort Attitude Self-Discipline TOTAL: 70 Points ______...
View Full Document

Ask a homework question - tutors are online