Ops Session 4 Project Management o Crashing o CPM with 3 time estimates Project Crashing (reducing the length of time of a project) o Estimated time is fixed…no more o Can reduce through additional resources Manpower, equipment o Direct cost of activity is always increased Motivation o Need to reduce time of project because: Requirement to complete in specified time frame Economic advantage o Three kinds of costs Crash costs (activity direct costs) Can be given directly, or need to determine through linear  interpolation Administration costs (or project indirect costs) Penalty costs o Incur crash costs to avoid administration and penalty costs Procedure o Always crash one period at a time! o 1. Identify options – critical activities o 2. Select least expensive o 3. Savings? Implement is so. Update all paths
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/18/2011 for the course BUS 370 taught by Professor Camp during the Fall '09 term at Indiana.

Page1 / 2

23download_doc-12.php - OpsSession4 ProjectManagement o...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online