2011-3-28-Lecture Drilling

2011-3-28-Lecture Drilling - Block 16 Drawworks 17 Drilling...

Info iconThis preview shows pages 1–23. Sign up to view the full content.

View Full Document Right Arrow Icon
rinciple Drilling Rig Functions Principle Drilling Rig Functions A drilling rig has four key functions. (1) Hoisting operations. (2) Circulation of drilling fluid. (3) Pipe (Bit) rotation. (4) Pressure control.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
7 aising the Mast Raising the Mast
Background image of page 2
8 cean Star Jack p Ocean Star Jack-up
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
9 ack p rig Jack-up rig
Background image of page 4
10 Jack-up towed to sea
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
11 lowout Preventer (BOP) Blowout Preventer (BOP)
Background image of page 6
12 OP rams BOP rams
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
13 BOP ccumulators Accumulators
Background image of page 8
14 Derrick and ipe Ramp Pipe Ramp
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
15 rawworks Drawworks & Travelling
Background image of page 10
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 12
Background image of page 13

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 14
Background image of page 15

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 16
Background image of page 17

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 18
Background image of page 19

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 20
Background image of page 21

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 22
Background image of page 23
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Block 16 Drawworks 17 Drilling System 18 Hook, Bail, wivel Swivel, Mud Hose & Mud Hose 19 Rotary Table with: kelly and kelly bushing 20 rill Pipe Drill Pipe 21 rill bits (roller cone & diamond) Drill bits (roller cone & diamond) 22 levators Elevators 23 Circulating System 24 ell Completion Well Completion 25 Wireline Logging Unit 26 rill ship Drill ship 27 emi- ubmersible Se sub e s b e 28 emi ubmersible Semi-submersible...
View Full Document

This note was uploaded on 04/18/2011 for the course PGE 301 taught by Professor Olson during the Spring '11 term at University of Texas at Austin.

Page1 / 23

2011-3-28-Lecture Drilling - Block 16 Drawworks 17 Drilling...

This preview shows document pages 1 - 23. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online