CH_14_10th_Edition

CH_14_10th_Edition - MRP and ERP CHAPTER 14 MRP AND ERP...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: MRP and ERP CHAPTER 14 MRP AND ERP PROBLEMS P1. Here are the parts list and the lead time for product TT. Item Child Items Lead time Current On- hand Inventory Product TT Subassembly A (2 required); Component B 1 week none Subassembly A Component B (3 required); Component C; Component D (2 required) 1 week none Component B none 2 weeks 200 Component C none 1 week none Component D none 1 week 100 The master schedule for Product TT is: Week Number 1 2 3 4 5 6 Quantity 25 50 75 a. Construct the product-structure tree for product TT. b. Determine the total quantity of each subassembly and component that will be required to build all the requirements stated in the master schedule for Product TT. P2. Use the data in Problem P1 to prepare a material requirements plan to meet the requirements stated in the master schedule. Blank MRP records have been provided for your use, following this problem. 187 Chapter 14 1 2 3 4 5 6 Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases 1 2 3 4 5 6 Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases 1 2 3 4 5 6 Gross requirements Scheduled receipts...
View Full Document

Page1 / 7

CH_14_10th_Edition - MRP and ERP CHAPTER 14 MRP AND ERP...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online