Lecture Suggestions - Chapter 14 Example 2: MRP 1. Select the Example 2 worksheet 2. 3. Initialize MRP schedule with product structure: a. Table 1 (A6): Shutters, Quantity = 1, LT = 1 b. Table 2 (A13): Frames, Quantity = 2, LT = 2 c. Table 3 (S13): Wood sections, Quantity = 4, LT = 1 4. Enter Scheduled receipts = 70 in period 1 for wood sections.
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 5. 6. 7. Clear worksheet (press Clear and confirm with OK). Enter orders in master schedule: 100 in week 4 and 150 in week 8 Trace orders down to planned order releases for each subassembly. Enter lot size = 70 for wood sections and trace the effect in the table for wood sections. ....
View Full Document

This note was uploaded on 04/21/2011 for the course MGT 02 taught by Professor Gad during the Spring '11 term at Tanta University.

Ask a homework question - tutors are online