Project Management—Constructing and Analyzing a Project Network Given the following set of project management data, please answer the following questions. All times are in weeks. ActivityPredecessor Optimistic Time Most Likely Time Pessimistic Time A 1 2 4 B A 3 5 9 C A 6 6 6 D A 3 5 7 E D 8 10 14 F B, C 4 7 10 G C, E, F 3 4 5 Assignment Questions 1. Calculate the expected time for each activity. 2. Identify all the paths through the network and their lengths.
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 3. Identify the critical path (i.e., the path with the longest time in the project). 4. Which path has the most slack? How much slack? 5. Calculate the ES, LS, EF, and LF times for each activity. 6. Which activities have slack available? How much? 7. If a project begins to fall behind, what can a project manager do to get it back on schedule?...
View Full Document

Ask a homework question - tutors are online