Sourcing Energy at a Steel Manufacturer 1. Consider the different suppliers – which one would you select? What type of agreement would you use? 2. What are the risks and rewards to consider in this case? How can the team balance these risks and rewards? A large steel producer in Pennsylvania decided to open up its energy- spending contract to a number of existing and new energy providers that had entered the market as a result of deregulation. Up to this time, each of the steel plants had a separate contract with the local energy provider. The goal was to include existing local suppliers, but also identify potential new entrants. The strategy development team included managers from building and property maintenance, engineering, plant stakeholders, and purchasing. Initially, the team elected to consider just a single facility contract as a pilot for their energy sourcing strategy. Of their other facilities: Pennsylvania – one facility considered had contracts expiring; the other is not yet in an openly competitive market, but will be in a year Maryland – competition arrives in two years New York – currently being served by a low cost hydroelectric provider – it is unlikely that anyone can compete with this provider Indiana – status of deregulation still unsure. For the facility in Pennsylvania new entrants were identified and researched by studying their websites, and were sent an RFP. As a result of this open RFP,
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
four potential suppliers were identified and interviewed to identify their proposals for reducing the organizations’ energy cost. This included the current supplier (Company A) and three new suppliers. Next, each supplier was invited to visit and present their case to the team, emphasizing why they should be the provider
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/21/2011 for the course MGT 01 taught by Professor Gad during the Spring '11 term at Tanta University.

Page1 / 6

Sourcing Energy at a Steel Manufacturer - Sourcing Energy...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online