ch18 - CHAPTER 18 REVENUE RECOGNITION TRUE-FALSE Conceptual...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: CHAPTER 18 REVENUE RECOGNITION TRUE-FALSE Conceptual Answer No. Description F 1. Recognition of revenue. T 2. Realization of revenue. T 3. Delayed recognition of revenue. F 4. Recognizing revenue when right of return exists. T 5. Recognizing revenue prior to product completion. F 6. Use of percentage-of-completion method. T 7. Input measure for contract progress. T 8. Reporting Construction in Process and Billings on Construction in Process. F 9. Construction in Process account balance. F 10. Recognition of revenue under completed-contract method. T 11. Principal advantage of completed-contract method. F 12. Recognizing loss on an unprofitable contract. F 13. Recognizing current period loss on a profitable contract. T 14. Recognizing revenue under completion-of-production basis. F 15. Recording a loss on an unprofitable contract. F 16. Deferring revenue under installment-sales method. T 17. Deferring gross profit under installment-sales method. T 18. Classification of deferred gross profit. F 19. Recognizing revenue under cost-recovery method. T 20. Recognizing profit under cost-recovery method. MULTIPLE CHOICE Conceptual Answer No. Description c 21. Revenue recognition principle. b 22. Definition of "realized." a 23. Definition of "earned." b S 24. Revenue recognition representations. d P 25. Definition of recognition. b P 26. Revenue recognition principle. d 27. Recognizing revenue at point of sale. d 28. Recording sales when right of return exists. c 29. Revenue recognition when right of return exists. d 30. Revenue recognition when right of return exists. b 31. Appropriate accounting method for long-term contracts. c 32. Percentage-of-completion method. b 33. Percentage-of-completion method. c 34. Classification of progress billings and construction in process. b 35. Calculation of gross profit using percentage-of-completion. a 36. Disclosure of earned but unbilled revenues. b 37. Disadvantage of using percentage-of-completion. d S 38. Percentage-of-completion input measures. Test Bank for Intermediate Accounting, Twelfth Edition MULTIPLE CHOICE Conceptual (cont.) Answer No. Description a S 39. Advantage of completed-contract method c 40. Revenue, cost, and gross profit under the completed-contract method. a 41. Loss recognition on a long-term contract. c 42. Accounting for long-term contract losses. d 43. Criteria for revenue recognition of completion of production. a 44. Completion-of-production basis. d S 45. Revenue recognition of completion of production. b S 46. Treatment of estimated contract cost increase. c 47. Presentation of deferred gross profit. c 48. Appropriate use of the installment-sales method. b 49. Valuing repossessed assets....
View Full Document

This note was uploaded on 04/21/2011 for the course ACC 02 taught by Professor Hashash during the Spring '11 term at Tanta University.

Page1 / 42

ch18 - CHAPTER 18 REVENUE RECOGNITION TRUE-FALSE Conceptual...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online