Quiz 2 - Janice Thomas 10:02 AM Quiz2 Completed 95 out of...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Janice Thomas 1/10/11 10:02 AM Quiz2 Completed 95 out of 100 points 25 minutes, and 32 seconds out of 1 hour. The quiz consists of 20 equally-weighted, objective-type questi larger pool of questions. The quiz may be taken "open book". It • Question 1 5 out of 5 points A contractor's project being analyzed by PERT has an estimated time for the critical path of 120 days. The sum of all activity variances is 81; the sum of variances along the critical path is 64. The probability that the project will take 130 or more days to complete is Answer Selected Answer: 0.1057 • Question 2 5 out of 5 points Ethical issues that may arise in projects large and small include Answer Selected Answer: all of these • Question 3 5 out of 5 points Which of the following statements regarding PERT times is true? Answer Selected Answer: The probable time estimate is calculated as t = (a + 4m + b)/6. • Question 4 5 out of 5 points A network has been crashed to the point where all activities are critical. Additional crashing Answer Selected Answer: may require crashing multiple tasks simultaneously •...
View Full Document

This note was uploaded on 04/24/2011 for the course MGT 3373 taught by Professor Kitahara during the Spring '09 term at Troy.

Page1 / 12

Quiz 2 - Janice Thomas 10:02 AM Quiz2 Completed 95 out of...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online