Week 8 quiz

Week 8 quiz - Janice Thomas 2/21/11 10:43 AM Quiz8...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Janice Thomas 2/21/11 10:43 AM Quiz8 Completed 90 out of 100 points 39 minutes, and 20 seconds out of 1 hour. The quiz consists of 20 equally-weighted, objective-type questi larger pool of questions. The quiz may be taken "open book". It
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Question 1 5 out of 5 points The following table is an example of a(n) Answer Selected Answer: master production schedule Question 2 5 out of 5 points Which of the following best describes a gross material requirements plan? Answer Selected Answer:
Background image of page 2
item, and when it must be ordered from a supplier or when production must be started Question 3 5 out of 5 points Finite capacity scheduling, unlike MRP, recognizes the capacity limitations of departments and machines when building schedules. Answer Selected Answer: True Question 4 5 out of 5 points Smoothing a resource requirements profile to stay within capacity limits may increase setup costs. Answer
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/24/2011 for the course MGT 3373 taught by Professor Kitahara during the Spring '09 term at Troy.

Page1 / 12

Week 8 quiz - Janice Thomas 2/21/11 10:43 AM Quiz8...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online