Assignment5_S11 (1)

Assignment5_S11 (1) - 3 0.3 4 0.1 5 0.2 1 6 5 2 9 3 4 7 8...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
IE383 Assignment 5 Note: Keep three decimal points for all the results, if applicable. You do not need to turn in this assignment; the solution will be released by 5:00 PM Friday, 02/11/2011 Problem 1 a) Determine the system line yield. Draw diagrams to show your process in simplifying the systems. b) Determine the scrap rate at workstation 3. Problem 2 Workstation Scrap rate 1 0.1 2 0.25
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 3 0.3 4 0.1 5 0.2 1 6 5 2 9 3 4 7 8 10 0.3 0.2 0.3 0.2 0.4 The scrap rate for each workstation is given in the table below. Determine the line yield for the entire system, and show diagrams to show your simplification of the system. Workstations 3, 4, 8 and 10 are rework stations. Workstation Scrap rate 1 0.1 2 0.2 3 0.1 4 0.2 5 0.2 6 0.1 7 0.3 8 0.2 9 0.2 10 0.1...
View Full Document

Page1 / 2

Assignment5_S11 (1) - 3 0.3 4 0.1 5 0.2 1 6 5 2 9 3 4 7 8...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online