WORKSHEET - COST COMPARISIONS BETWEEN AWO 14, 15 AND 32

WORKSHEET COST - $4,048,667 w/o markups Cost/CY $1,583.99 III AWO 32 CONCRETE WORKS AT SITE L CP6 INVERT& BENCHES(Costs do not include

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
WORKSHEET - COST COMPARISIONS BETWEEN AWO 14, 15 AND 32 I. AWO 14 - SHAFT K, T3/T4, T3A CONCRETE A. Addition Shaft K Revised 1680 CY New T3A Adit 1090 CY 2770 CY COST Shaft K $5,035,972 T3A $1,777,991 Shift and Service Crew $2,414,606 WP K ($162,900) WO T3A ($106,800) TOTAL $8,958,869 w/o mark ups $3234.75 /CY B. Deletions Shaft K Original 1763 CY T3/T4 Original 1981 CY 3774 CY COST Shaft K $4,040,983 T3/T4 $4,628,254 Shift and Service Crew $3,582,602 WP K ($144,420) WP T3/T4 ($288,000) TOTAL $11,819,419 $3156 /CY II. AWO 15 - CAVERN AND NORTH INTERLOCK CONCRETE A. Additions 78 LF North Interlock Quantities Starter Wall 197 CY Arch 1084 CY Invert 309 CY 1590 CY Cost $2,264,269 Includes Shifts and Service Crew WP ($169,836) TOTAL $2,094,433 W/o markups Cost/CY $1,317 B. Credits Cavern Quantities
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Starter Wall 145 CY Low Wall 474 CY Mezz Slab 466 CY Upper Wall 121 CY Arch 1008 CY Invert 342 CY 2556 CY Cost WP ($225,147) TOTAL
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: $4,048,667 w/o markups Cost/CY $1,583.99 III. AWO 32 - CONCRETE WORKS AT SITE L, CP6, INVERT & BENCHES (Costs do not include costs/adds) A. Site L Site L1 Shaft & Adit 4285 CY Cost L1 Shaft & Adit $11,021,485 Includes Shift & Service Crew WP ($508,050) TOTAL $10,513,435.00 w/o markups Cost/CY $2,453.54 L2 Shaft & Adit 2700 CY Cost L2 Shaft & Adit $9,163,615 Includes Shift & Service Crew WP-$424,845 TOTAL $8,738,770 w/o markups Cost/CY $3236.58 /CY B. Cross Passage 6 CP 6 Quantity 505 CY Cost $1,194,310 w/o Shift & Service Crew (in L2) Cost/CY $2364.97/CY w/o markups C. Invert and Benches Invert and Benches Quantity 18670 CYS Cost Total $39,387,478 w/o markups Drain MH's ($381,785) Duct MH's ($789,025) Drain Pipe ($178,170) FRE Ducts ($3,781,420) PMs (FRE & MHs) ($2,064,730) TOTAL $32,242,348 w/o markups Cost/CY $1725.11/CY...
View Full Document

This note was uploaded on 04/26/2011 for the course TM 811 taught by Professor Charlie during the Spring '11 term at NYU Poly.

Page1 / 2

WORKSHEET COST - $4,048,667 w/o markups Cost/CY $1,583.99 III AWO 32 CONCRETE WORKS AT SITE L CP6 INVERT& BENCHES(Costs do not include