Duct Bench & Invert MTA Spreadsheet

Duct Bench & Invert MTA Spreadsheet - CONFIDENTIAL NEW...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
CONFIDENTIAL 2d6ab9152079b9b6c3927a786e98a87dcd2607c3.xls NEW YORK CITY TRANSIT NO. # 7 SUBWAY EXTENSION PROJECT PREPARED BY: JACK ELY Date: 8/21/06 PROJECT SUMMARY Description 8-18-06 ESTIMATE DELTA NOTES 8-18-06 ESTIMATE DELTA NOTES Delta Cost Saving Total Project Cost w/D315 Contract #REF! $2,521,000,000 #REF! #REF! $2,445,000,000 #REF! #REF! 82 Months 80 Months D315 Performed in D200 ( Included Above ) #REF! #REF! D305/D400 Performed in D200 ( Included Above ) #REF! #REF! Total Project Cost without D315 Contract #REF! $2,308,000,000 #REF! #REF! $2,180,000,000 #REF! #REF! #REF! $213,000,000 #REF! #REF! $265,000,000 #REF! #REF! #REF! $239,000,000 #REF! #REF! $297,000,000 #REF! #REF! REVIEWED BY: RR 10th Avenue Station Cut 10th Avenue Station Mined Option Schedule Including 6 Months Commissioning 17M from d200 +6.6 new items + escalation ***Portion of North Entrance (Restrooms) under L Building Excavation ***Elevator Shaft, Escalator Bank, Portion of North Entrance (Restrooms) under L Building ***Excavation of L Building w/ Temporary Decking ***Excavation of L Building w/ Temporary Decking & Caissons @ Escalator Bank D315 Contract ( Build Along Current Scope of Work ) 17M moved to d200, Add 20% Contingency D315 Contract ( Future Build - Start June 2013 )
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
AWO 19 - EXCAVATION CREDIT FOR SITE K CHANGES AND REDUCTION OF CAVERN LENGTH - QUANTITY SUMMARY S3II 05/14/09 DESCRIPTION QUANTITY UNITS I - NORTH CAVERN EXCAVATION A. ROCK (BANK) EXC 10001 CYS B. OVERBREAK EXC 881 CYS C. SHOTCRETE - 6" 251 CYS D. ROCKBOLTS 1. #8 X 18' DYWIDAG 10080 LF 2. #8 X 12' SWELLEX 2304 LF E. MUDMAT CONC 295 CYS II - NORTH INTERLOCK A. ROCK (BANK) EXC 4967 CYS B. OVERBREAK EXC 698 CYS C. SHOTCRETE - 6" 181 CYS D. ROCKBOLTS 1. #8 X 18' DYWIDAG 10080 LF 2. #8 X 12' SWELLEX 768 LF E. MUDMAT CONC 295 CYS III- SHAFT K ORIGINAL (EL 92 TO EL 15.77) A. ROCK (BANK) EXC 4280 CYS B. OVERBREAK EXC 603 CYS C. SHOTCRETE 114 CYS D. SPILING 1" X 13' 1400 LF E. ROCKBOLTS 1" X 8' 2800 LF F. MUDMAT CONC 92 CYS IV- SHAFT K REVISED (EL 92 TO EL 5.45) A. ROCK (BANK) EXC 6037 CYS B. OVERBREAK EXC 803 CYS C. SHOTCRETE 161 CYS D. SPILING 1" X 13' 806 LF E. ROCKBOLTS 1" X 8' 4080 LF F. MUDMAT CONC 105 CYS V- T3/T4 ADITS (ORIGINAL) A. T3 1. EXCAVATION BANK EXC 3338 CYS
Background image of page 2
PROPOSER NAME:__________________________ PROPOSER'S PROPOSAL-PRICE SCHEDULE C-26503 Page 3 Sheet 3 of 14 Jan.31,2007 PROPOSAL PRICE SCHEDULE (WITHOUT FULL SHELL ALTERNATE) CONTRACT C-26503 DESCRIPTION OF ITEM UNIT 1 All Mobilization not to exceed for the lump sum of dollars
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 14

Duct Bench & Invert MTA Spreadsheet - CONFIDENTIAL NEW...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online