Site J - Cost Summary

Site J - Cost Summary - NEW YORK CITY TRANSIT (MTA) Site J...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Page 1 file:////home/vdimitrov/30365/6fc1328c2fc77e8fc37d3b567ccda9491ce29ac5.xls NEW YORK CITY TRANSIT (MTA) Site J Excavation Cost Summary Worksheet DESCRIPTION QUANTITY UNIT LABOR HOURS LABOR COST RENT EQUIPMENT 100000 Mob/Prep Work 110000 Set-up Temporary Utility Services 1 LS 1,625 154,730 197,205 31,240 0 18,035 19,870 421,080 120000 Site Prep Work 1 LS 3,430 330,395 40,000 210,250 23,750 32,235 39,160 675,790 130000 Mobilize Equipment to Site 1 LS 490 47,200 343,700 0 0 4,605 5,595 401,100 140000 Dewatering - Site 1 LS 0 0 0 0 0 0 0 150000 Instrumentation 1 LS 0 0 1,000,000 0 0 0 1,000,000 160000 Safety Bulkhead in Cavern 3 EA 770 75,300 0 20,850 0 5,215 5,165 106,530 0 200000 Demolition/Common Excav 0 240000 Wall Demolition 150 CY 325 27,050 7,605 0 0 5,280 5,125 45,060 0 400000 Rock Excavation 0 440000 Rock Excavation 1 LS 52,040 5,685,395 2,879,240 6,797,060 1,778,070 227,625 536,850 17,904,240 0 500000 Mud Slabs 0 510000 Mud Slab - Top Area 4,265 CY 5,500 538,755 0 18,400 981,475 63,285 64,090 1,666,005 520000 Mud Slab - UG Area
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/26/2011 for the course TM 811 taught by Professor Charlie during the Spring '11 term at NYU Poly.

Page1 / 2

Site J - Cost Summary - NEW YORK CITY TRANSIT (MTA) Site J...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online