Site L Cost Summary

Site L Cost Summary - NEW YORK CITY TRANSIT (MTA)...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
f5996877bebab48a35d8cf07ca7f385143da41d9.xls Page 1 of 2 NEW YORK CITY TRANSIT (MTA) Additional Work at Site L Cost Summary Worksheet DESCRIPTION QUANTITY UNIT LABOR HOURS LABOR COST RENT EQUIPMENT 100000 Mob/Prep Work 110000 Set-up Temporary Utility Services 1 LS 980 112,645 188,200 26,560 0 9,210 11,190 347,805 120000 Site Work 1 LS 1,960 225,290 0 143,375 0 18,420 22,375 409,460 130000 Mobilize Equipment to Site 1 LS 490 56,320 62,500 0 0 4,605 5,595 129,020 132300 Site L Pavement Work 1 LS 455 46,335 112,195 0 0 7,350 6,830 172,710 140000 Demobililze 1 LS 1,765 202,780 107,575 21,500 204,000 16,580 20,140 572,575 150000 - - - - - - - - - - - - - - - - - - - - 0 200000 L1 Shaft/Adit Excavation 0 210000 L1 Shaft Excavation 0 212000 L1 Shaft Rock Excavation 5,060 BCY 10,565 1,234,035 263,300 443,350 231,870 136,065 164,900 2,473,520 220000 L1 Adit Excavation 0 221000 L1 Adit Top Heading Excav 1,765 BCY 7,225 838,170 94,000 237,205 111,280 86,540 133,950 1,501,145 222000 L1 Adit Bench Excav 1,030 BCY 5,340 620,270 59,500 150,200 95,400 60,065 90,525 1,075,960 223000 L1 Main Tunnel Excav/Demo 0 223100 L1 Main Tunnel Bracing/Supt
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/26/2011 for the course TM 811 taught by Professor Charlie during the Spring '11 term at NYU Poly.

Page1 / 2

Site L Cost Summary - NEW YORK CITY TRANSIT (MTA)...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online