Task4Tables - C 3 $18,000 $24,000 D 7 $36,800 $44,800 E 3...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
PERT/CPM Analysis Task Detail Table 1.1 Task START A START 2 3 4 B START 5 6 13 C A 3 4 8 D B 10 11 15 E C 4 5 6 F B 8 10 12 G F 4 6 11 H D,E 8 10 18 I G 3 6 12 J H,I 2 3 7 END Preceding Activity Optimistic Time to Complete (weeks) Probable Time to Complete (weeks) Pessimisti c Time to Complete (weeks) Expected Time to Complete (weeks) Variance (weeks)
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
PERT/CPM Analysis Task Detail Table 1.2 Task START A 2 $8,400 $11,200 B 5 $28,000 $40,000
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: C 3 $18,000 $24,000 D 7 $36,800 $44,800 E 3 $14,000 $16,800 F 6 $20,000 $24,000 G 5 $18,200 $28,000 H 8 $44,000 $64,000 I 4.5 $26,000 $36,000 J 3 $21,000 $36,000 END Expected Time to Complete Normal Cost Crash Cost Maximum Reduction in Time Crash Cost per week Normal (weeks) Crash (weeks)...
View Full Document

Page1 / 2

Task4Tables - C 3 $18,000 $24,000 D 7 $36,800 $44,800 E 3...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online