HW 4 - Manager account1. Please consider the cases in each...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Bill account 2 mins Deliver 12 mins Sommelier 6 mins Kitchen 18 mins Waiter 10 mins Manager 4 mins 1. Please consider the cases in each part individually and answer the questions in each part. a) There are two resources in a process (A & B). Resource A is involved in two activities, which take it 10 minutes and 5 minutes each. Resource B is involved in only one activity, which takes it 15 minutes. Calculate the unit loads of each resource. T PA = 10+5=15 min/unit T PB = 15 min/unit b) There are two resources in a process (A & B). Resource A is involved in two activities, which take it 10 minutes and 5 minutes each for each visit of a flow unit. On average flow units visit the 10 minute activity (1.1 times) and visit the 5 minute activity (1.5 times). Resource B is involved in only one activity, which takes it 15 minutes and flow units visit an average of 1.0 times. Calculate the unit loads of each resource. T
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/30/2011 for the course MBA 806 taught by Professor Fredendall during the Spring '08 term at Clemson.

Page1 / 2

HW 4 - Manager account1. Please consider the cases in each...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online