MBA 806 HW3 Group 6

MBA 806 HW3 Group 6 - Homework 3 2/8/11 MBA 806 Group 6 1....

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Homework 3 MBA 806 2/8/11 Group 6 1. The theoretical flow time of a process is 20 minutes. The average waiting time of the process is 40 minutes. What is the flow time efficiency of the process? Average flow time = Theoretical time + Average waiting time Average flow time = 20 mins + 40 mins=60 mins Flow-time efficiency = Theoretical flow time / Average flow time. Flow-time efficiency = 20 mins / 60 mins =33.33% 2. The activity time of a process is 10 minutes. The average number of visits to that process is 1½. What is the work content of the process per flow unit? Work content = Activity time * number of visit Work content = 10 mins * 1½ =15 mins Please answer both of the questions 3 and 4, one of them will be graded as a part of HW 3 3. NOTE: This is a modification of Exercise 3.5 on p. 69. There are changes, so DO NOT do the exercise the way it is in the text. SCENARIO: A triage system has been proposed for the emergency room. On average 50 patients per hour arrive. The emergency room uses a triage system. First, patients who are entering must stand in
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/30/2011 for the course MBA 806 taught by Professor Fredendall during the Spring '08 term at Clemson.

Page1 / 3

MBA 806 HW3 Group 6 - Homework 3 2/8/11 MBA 806 Group 6 1....

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online