chbe2120spring2011hw9

chbe2120spring2011hw9 - ChBE 2120 Homework 9 Due: Friday,...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ChBE 2120 Homework 9 Due: Friday, April 8, 2011 at 11:00 PM NOTE the extended deadline. You can already complete number 1 and parts b, d, and e of number 2. The material for parts 2 through 4 will be covered in class on Tuesday, hence the extension. Since there is a Matlab component for this assignment, I ask that you turn in the entire assignment via T-Square so that there is less work in collating the grading. For problems 1-3, you can do the work on paper or in a Word document, but if you do the work on paper, please scan your work to PDF format. (Scanners are available in the ChBE computer cluster and in the computer cluster at the library.) 1. Determine the current cost of the following equipment using the appropriate correlations from SSL. Assume the CE index is currently 575. - A stainless steel furnace with a heat duty of 95 MW and operating at 1000 psig. - A vertical pressure vessel made of SA-387B low-alloy steel with an inside diameter of 7 feet, a shell length of 39 ft, operating at 100 psig and 750 degrees F. Treat weld
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

chbe2120spring2011hw9 - ChBE 2120 Homework 9 Due: Friday,...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online