10-03Pr_5e

10-03Pr_5e - Direct Materials Direct Labor Description...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Problem 10-3 Name: Section: Score: 0% Answers are entered in the cells with gray backgrounds. Cells with non-gray backgrounds are protected and cannot be edited. A red asterisk (*) will appear in the row immediately to the right of an incorrect answer. a. JOB ORDER COST SHEET Customer Queen Mercury Date Address 10 Rhapsody Lane Date wan Lake Forest Date com Item Reupholster couch and chair Job. No. ESTIMATE Direct Materials Direct Labor Amount 40 meters at $12 24 hours at $15 Total ACTUAL
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Direct Materials Direct Labor Description Amount Description 210 24 meters at $12 H25 18 hours at $14.50 212 21 meters at $12 H34 9 hours at $14.50 Total Total Comments: Instructions Mat. Req. No. Time Ticket No. May 10, 2010 nted June 12, 2010 mpleted June 8, 2010 10-206 Summary Amount Amount Direct materials Direct labor Factory overhead Total Summary Amount Item Amount Direct materials Direct labor Factory overhead Total...
View Full Document

Page1 / 2

10-03Pr_5e - Direct Materials Direct Labor Description...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online