10-04Pr_5e

10-04Pr_5e - Quantity Process Materials Labor Overhead Cost...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Problem 10-4 Name: Section: Score: 19% *Since some answer boxes are correct when left blank, the beginning score is greater than 0%. Answers are entered in the cells with gray backgrounds. Cells with non-gray backgrounds are protected and cannot be edited. A red asterisk (*) will appear in the row immediately to the right of an incorrect answer. 1. Supporting calculations: July 1 Work in Direct Direct Factory Total Job. No.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Quantity Process Materials Labor Overhead Cost No. 21 200 $20,000 $15,000 No. 22 400 34,000 26,000 No. 23 200 14,000 8,000 No. 24 250 30,000 25,000 No. 25 180 22,000 17,500 No. 26 140 8,000 4,500 Total 1,370 $128,000 $96,000 A. B. C. D. E. F. G. H. 2. July 31 balances: Materials Work in Process Finished Goods Factory Overhead Instructions Cost of Unit Units Goods Cost Sold Sold...
View Full Document

This note was uploaded on 05/02/2011 for the course ACC 121 taught by Professor Thomas during the Spring '08 term at Baker MI.

Page1 / 3

10-04Pr_5e - Quantity Process Materials Labor Overhead Cost...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online