12-01Pr_5e

12-01Pr_5e - Cost of equipment less residual value...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Problem 12-1 Name: Section: Score: 0% Answers are entered in the cells with gray backgrounds. Cells with non-gray backgrounds are protected and cannot be edited. A red asterisk (*) will appear in the row immediately to the right of an incorrect answer. 1. Proposal to Operate Warehouse March 1, 2010 Differential revenue from alternatives: Revenue from operating warehouse Revenue from investment in bonds Differential revenue from operating warehouse Differential cost of alternatives: Costs to operate warehouse
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Cost of equipment less residual value Differential cost of operating warehouse Differential income from operating warehouse 2. Should the proposal to operate the warehouse be accepted? 3. Total estimated revenue from operating warehouse Total estimated expenses to operate warehouse: Costs to operate warehouse, excluding depreciation Cost of warehouse equipment less residual value Total estimated income from operating warehouse Instructions...
View Full Document

This note was uploaded on 05/02/2011 for the course ACC 121 taught by Professor Thomas during the Spring '08 term at Baker MI.

Page1 / 3

12-01Pr_5e - Cost of equipment less residual value...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online