M6-27a - E6-27 a. Total overhead costs: Setup Ordering...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: E6-27 a. Total overhead costs: Setup Ordering Maintenance Power Direct labor hours Overhead cost per direct labor hour Job cost calculations: $ 900,000 240,000 1,200,000 120,000 $2,460,000 ÷ 60,000 $ 41 Job 201 Job 202 Direct materials Direct labor Overhead ($41 × 270) and ($41 × 330) $13,500 18,000 11,070 $42,570 $15,000 71,250 13,530 $99,780 ÷ 900 $110.87 Units produced Cost per unit ÷ 1,125 $37.84 ...
View Full Document

This note was uploaded on 05/08/2011 for the course 193431918X 711 taught by Professor Braham during the Spring '11 term at Missouri (Mizzou).

Ask a homework question - tutors are online