Final_Exam_Formula_Sheet

Final_Exam_Formula_Sheet - where: = process average LTL =...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
SCM 372 Final Exam Formula Sheet MPS Projected Inventory = Available on-hand – max{Demand Forecast, Booked Orders} Available-to-Promise = Scheduled Production – Booked Orders until next Scheduled Production Least Total Cost (LTC) =  {Holding Cost i   – Ordering Cost i } Least Unit Cost (LUC) =  Number of kanbans =  where: D  = average demand T  = lead time to replenish order S  = safety stock C  = number of parts per container Average =  Standard Deviation =  Capability Index = 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: where: = process average LTL = lower tolerance/spec limit UTL = upper tolerance/spec limit = standard deviation Range = Grand average = Average range = Upper control limit for average = Lower control limit for average = Upper control limit for range = Lower control limit for range = Slack Time Remaining = STR t = Due Date t Processing Time Critical Ratio = Average Inventory =...
View Full Document

This note was uploaded on 05/09/2011 for the course SCM 372 taught by Professor Cook during the Spring '11 term at Michigan State University.

Page1 / 2

Final_Exam_Formula_Sheet - where: = process average LTL =...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online