Final Project - Running head: Final Project: Club IT Part...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Running head: Final Project: Club IT Part Three 1 Final Project: Club IT Part Three Gus Arrieta XBIS/219 September 25, 2010 Shawn M. Rieder DM/IST, MBA, MIS
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Club IT Part Three 2 Club IT Part Three The numbers from a respective view have increased at Club IT since its initial launch night. The flocks have gathered, and continue to bloom each evening. The goal is obtaining enough sales and profits to expect an expansion of Club IT’s services by opening another location soon. The minor adjustments will unveil the major results. The understanding is keeping that positive energy throughout this upgrade. Like every transition, it is a process, but definitely for the better, the results, and the changes will appear more obvious. Booming business will happen in the many assorted avenues. Stand in preparation Club IT staff, each time that sun goes down because this will be the spot for the night. Ruben and Lisa, I want to give thanks for the opportunity to take the time to reveal the new and improved Club IT. Demographics As Club IT introduced itself over the past year, the appeal of the club’s design attracted a suitable amount of locals into the nights. Sustainable as the attendance continued to grow, there was a deficit in seeking the desires that Lisa and Ruben both promised to meet a goal. Attendees did spread word of mouth, but Club IT wanted to spread out and beyond the limited social groups and individuals locally. Club IT reached a limit based on its initial opening resources. The club’s system technology is not concurrent. It’s systems function under computer programs older than 2007. The connection speed for Internet is a dial-up connection via Ethernet adapter, and Club IT does not even have a dashboard system. To arrange the short term goal necessary and meet the long-term goal Lisa and Ruben desire, Club IT needs upgrades on its system technology and resources. Concepts
Background image of page 2
Club IT Part Three 3 Updating the nightclub’s information system and resources allows more capabilities in the services provided within the nightclub. The information system also ascends many more ideas and horizons for Club IT in regard to widespread. The public can walk by, know that Club IT exists, and never know the contents of what makes this club so special. Customers cannot see that heart. Customers do not see that love Lisa and Ruben put into this company. Opening the door for these requests will equip the workplace with a faster database first . The staff of Club IT is pleased to hear that database conversions will launch under a RAD process as a prototype. During this process, users review the system on JAD sessions. This means the staff will
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 05/10/2011 for the course BUS 210 taught by Professor Scottrought during the Spring '08 term at University of Phoenix.

Page1 / 9

Final Project - Running head: Final Project: Club IT Part...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online