21 grand design program strategy g3 fig 7 fig 8 fig 9

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ements of MIL-STD-498 4 Government in-house agencies (as developers) Foreword-4, 1.2.1 Grand Design program strategy G.3, Fig 7, Fig 8, Fig 9 Hardware Configuration Item (HWCI) 3.22, 3.24, 5.10; SDP 5.10; SRS 3.10.1; SSDD 4, 4.1; SSS 3.10.1 hardware-software systems 1.2.4.1, 1.2.4.2, Fig 14; SSDD 3; SSS 3.9, 3.10, 3.12 implementation (see software implementation and unit testing) Incremental program strategy Foreword-3, G.3, Fig 7, Fig 8, Fig 10 in-process in-process and final software product evaluations 5.15.1; SDP 5.15.1 joint reviews of in-process and final software products 5.18.1 independence independence in software product evaluation 5.15.3; SDP 5.15.3 independence in software quality assurance 5.16.3; SDP 5.16.3 independence in qualification testing 5.9.1, 5.11.1; SDP 5.9.1, 5.11.1 Independent Verification and Validation (IV&V) 3.23, 5.19.5, Fig 9-12; SDP 5.19.5 installation installation at the support site 5.13.7; STrP 7 installation at user sites 5.12.4, Fig 6, E.4.9, Fig 14; SCOM 4; SDP 5.12.4; SIP; SSS 3.16; SUM 4.1.3; SVD 3.6 software installation planning 5.1.4, 6.2, Fig 6, E.4.1, Fig 9-13, Fig 15, Fig 17; SDP 5.1.4; SIP integral software development processes 4.1 integration (see CSCI/HWCI integration and testing, unit integration and testing) interface 3.24 interface design, Interface Design Description (IDD) 5.4.1, 5.4.2, 5.6.1, 5.6.2, 5.6.3, 6.2, Fig 6, Fig 9-12, Fig 15-17; DBDD 3, 5.x; IDD; SDD 3, 4.3, 5, 5.x, 6; SPS 5.1; SSDD 3, 4.3, 5 interface requirements, Interface Requirements Specification (IRS) 5.3.3, 5.5, 5.9, 5.11, 6.2, Fig 6, Fig 9-12, Fig 15-17; IRS; SRS 3.3, 3.4; SSS 3.3, 3.4; STD 5; STP 6 ISO/IEC DIS 12207 Foreword-6 joint technical and management reviews 3.25, 4.1, Fig 1 5.18, Fig 2-3, Fig 9-12, G.6.3, H.3; SDP 5.18 candidate joint management reviews Appendix E key decisions (recording rationale for key decisions) 3.34, 4.2.6, 5.2.4; all DIDs: Notes section; SDP 4.2.6 key word listing in MIL-STD-498 6.8 key terms (mapping of key MIL-STD-498 terms to DOD-STD-2167A, DOD-STD-7935A) I.3, Fig 14 licenses, licensing B.3, Fig 3; STP 3.x.4; STrP 3.2, 3.3, 3.4 (also see data rights) life cycle Foreword-4, Fig 2, Fig 5, G.2; SDP 3 logistics SRS 3.15; SSS 3.15 (also see Continuous acquisition and life-cycle support (CALS)) maintenance Foreword-4, 1.2.1, 1.2.4.3, 3.33, 3.41, Fig 14 (also see software support) management indicators (see software management indicators) management review 5.1.6; SDP 5.1.6 metrics (see software management indicators) non-deliverable software products 1.2.2, 3.26, 5.2.5; SDP 5.2.5 Notes 6; all DIDs: Notes section operational concept, Operational Concept Description (OCD) 5.3.2, 6.2, Fig 3, Fig 4, Fig 6, E.4.2, Fig 9-12, Fig 15-17; OCD; SDP 5.3.2 operational concept reviews E.4.2 packaging, packaging requirements 5.14.5; SDP 5.14.5; SPS 3.3; SRS 3.17; SSS 3.17; STrP 7 participate (interpretation of "participate" in MIL-STD-498) 1.2.4.2 participation in system-level activities 5.1.3, 5.3, 5.4, 5.10, 5.11, 5.13.5, D.3; SDP 5.3, 5.4, 5.10, 5.11 planning (see build planning, project planning, software development planning, software installation planning...
View Full Document

This note was uploaded on 05/11/2011 for the course ELECTRONIC 005 taught by Professor Haghbin during the Spring '10 term at Sharif University of Technology.

Ask a homework question - tutors are online