quiz 2 solutions - Page 1 of 2 Name Quiz 2 BUSQOM 1070...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Page 1 of 2 Name________________________________________________ Quiz 2 BUSQOM 1070, Spring 2011 Monday, January 24, 2011 Using PERT, Harold Benson was able to determine that the expected project completion time for the construction of a yacht is 21 months, and the project variance is 4. 1. What is the probability that the project will be completed in 17 months? ( ) [ ] [ ] 17 – 21 17 – 2.0 2 1 2.0 1 0.97725 0.0228 = = =− =− = P t P z P z P z 2. What is the probability that the project will be completed in 20 months? ( ) [ ] [ ] 20 21 20 0.5 2 1 0.5 1 0.69146 0.3085 P t P z P z P z = = ≤ − =− =− = 3. What is the probability that the project will be completed in 23 months?
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}