PSA Report June 23

PSA Report June 23 - PSA Project Report Each member of the...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: PSA Project Report Each member of the PSA project team is required to submit a separate PSA Report typed in this format. DO NOT submit reports in plastic binders, covers, or sleeves!!! Naked paper and a staple will suffice. To save paper, use no more than an 11pt Font, single spaced with half inch margins top, bottom, left and right. Use this document as a template to type your actual report. Describe your role in each of the following aspects of the project. Rather than providing just a list of events, you should include a narrative description of each event . Make sure you list the date, time, and hours for each event and then the sum Total Hours for each of the following headings below: 1. Project Concept- discuss your input in the original idea and development of the PSA concept. (List Total Sum) . 2. Writing- discuss your involvement in the writing of the script for the PSA project. (List Total Sum) . 3. Pre-Production Coordination- list the dates, times, and hours you spent on the following pre-production activities: (Make sure to list a Total Sum for all Pre-Production hours) . A) Casting or Pre-Interviewing Talent - B) Location Scouting or Location Clearances - C) Facilities, Equipment, or Crew Scheduling - D) Craft Services (food), Lodging, or Transportation Arrangements - 4. Production- list the dates, times, and hours for each location shoot along with the function that you, your co- producer, and each crew member performed. (List a Total Sum for all Production hours on the project) . Wed July 14 th Beach Scene Shoot (8am-6pm) 10hrs Director Joe Blow Camera Suzie Q Boom Bob Blow Grips Tom Blow, Jane Doe We arrived at the location 2 hours before the actors in order to set up our gear and dress the set. Suzie was supposed to bring the props, but forgot to load them in the car. We had to send Tom to pick them up which delayed our lighting setup, so when the actors arrived, we were not ready and the actors had to wait. actors arrived, we were not ready and the actors had to wait....
View Full Document

Page1 / 2

PSA Report June 23 - PSA Project Report Each member of the...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online