Quiz6BKey - Please complete the forward and backward passes...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
15 10 5 C 11 6 10 6 4 D 10 6 0 0 0 ST 0 0 10 4 6 E 10 4 17 15 2 F 14 12 4 0 4 B 4 0 6 0 6 A 6 0 17 10 7 G 17 10 17 17 0 FIN 17 17 OSCM 230 Quiz 6B (Key)  Name: Score:           /10 pts  Activity Normal  Time  (Ti) (weeks) Budgeted  Cost  (Ci)  ($000) Crash Time =(T’ i ) (weeks) Crash  Cost (C’ i ) ($000) Cost = C’ - Ci  ($000) Time = Ti -T’ (week) Cost/ Time ($000/week) A 6 10 3 12 2 3 0.667 B 4 5 3 6 1 1 1.00 C 5 2 3 3.2 1.2 2 0.60 D 4 4 3 4.8 0.8 1 0.80 E 6 7 5 7.7 0.7 1 0.7 F 2 4 1 5 1 1 1.00 G 7 3 4 9 6 3 2.00 The project network diagram is provided below. This is how to read the table:  If a total of  $10,000 is spent on activity A, then it normally takes 6 weeks to finish activity A. If a total of  $12,000 is spent on activity A, then activity A can be finished within 3 weeks.  We assume a  linear cost structure, i.e., it costs (12,000-10,000)/(6-3) =  Cost/ Time  $ 667 to crash one week  out of activity A. A. (6 pts) Assuming each activity takes its normal time.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Please complete the forward and backward passes on the following project diagram . The project can be completed within ______ 17_[4pts, including numbers on graph]_____ weeks. The critical path(s) of the project is(are) __ B –E –G and A – D –G _ [2pts]. OSCM 230 Quiz 6B (Key) B. (4 pts) If we want to complete the project one week ahead of the current plan, what is the most cost effective crashing plan? That is, which activity (activities) would you pick to crash for one week__ A and E __[ 3pts ]_____? How much additional cost does crashing incur?______ $1367 ___[ 1pt]...
View Full Document

This note was uploaded on 05/15/2011 for the course OSCM 230 taught by Professor Dong during the Spring '08 term at Washington University in St. Louis.

Page1 / 2

Quiz6BKey - Please complete the forward and backward passes...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online