3. Given the project network and baseline information below, complete the form to develop a status report at the end of period 4 and end of period 8. From the data you have collected and computed for periods 4 and 8, what information are you prepared to tell the customer about the status of the project at the end of period 8? [CV=EV-AC, SV=EV-PV] Task DUR ES LF SL Budget (PV) 0 2 3 4 5 7 8 10 11 12 13 14 A 2 0 2 0 400 200 200 B 6 2 8 0 2400 200 600 C 5 2 9 2 1500 500 100 300 D 4 8 12 0 1600 E 3 7 12 2 900 F 3 12 15 0 Period PV Total 200 200 400 1000 700 800 Cumulative PV Total 200 400 800 1800 2500 3200 3700 4600 5400 6000 6400 6800 7000 7100 7400 Project Baseline (PV) in $ End of period 4 Actual % complete EV AC PV CV SV A Finished +100 0 B 50% 1000 -200 0 C 33% 0 D 0% 0 0 0 0 0 E 0 0 0 0 0 Cumulative Totals 1800 0 0 End of period 8 A 0 B 2200 +200 0 C 0 0 D 25% 0 0 -300 0 0 0 F 0 0 0 0 0 4600 0 a. I would tell the customer that we still have 7 periods to go, but the project is on track. And actually, we have been able to efficiently start one task of the project early while not exceeding our planned budget. We are 4% ahead of schedule (300/7400), and should see about the same in cost savings ($300) 4.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 05/16/2011 for the course OMGT 4783 taught by Professor Richardson during the Winter '11 term at Arkansas.

Page1 / 2

OMGT 4783 Ch 13 Assignment - 3. Given the project network...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online