OMGT 4783 Ch 4 Assignment

OMGT 4783 Ch 4 Assignment - Work Breakdown Structure The...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
  Work Breakdown Structure The Manchester United Soccer Club (MUSC) 31 Jan 2011, OMGT 4783, Project Management “The managerial process” Ch 4 Case Study,  page 125  
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
  Task: 1. Make a list of the major deliverables for the project and use them to develop a draft of the work breakdown structure for the tournament that contains at least three levels of detail. What are the major deliverables associated with hosting an event such as a soccer tournament? Organizing the Summer Tournament Deliverables: 1. Venue - major deliverable 1.1 Event Dates 1.2. Soccer fields 1.2.1. Parking 1.2.2. Sales areas for fundraising 1.3. Cost of Venue (donation?) 1.4. Referees 1.4.1 Available 1.4.2. Qualified 1.4.3. Professional 2. Team Management - major deliverable 2.1. Screening 2.1.1. Age 2.1.2. Gender 2.2. Registration fees 2.2.1. Individual participants 2.2.1.1. Complimentary T-shirt 2.2.1.2. Complimentary meal 2.2.2. Teams 2.3. Recognition 2.3.1. Decide type 2.3.1.1. Medals 2.3.1.2. Trophies
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 3

OMGT 4783 Ch 4 Assignment - Work Breakdown Structure The...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online