3110_Lecture_Ch06

3110_Lecture_Ch06 - Project Management Instructor: Dr. Vish...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
1 Project Management Instructor: Dr. Vish Hegde Lecture Chapter 6 ©All Rights Reserved by Dr. Vish Hegde 1 Developing the Project Plan • The Project Network – A flow chart that graphically depicts the sequence, interdependencies, and start and finish times of the project job plan of activities that is the critical path through the network. • Provides the basis for scheduling labor and equipment. • Enhances communication among project participants. • Provides an estimate of the project’s duration. • Provides a basis for budgeting cash flow. • Identifies activities that are critical. • Highlights activities that are “critical” and can not be delayed. • Help managers get and stay on plan. ©All Rights Reserved by Dr. Vish Hegde 2
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2 From Work Package to Network WBS/Work Packages to Network ©All Rights Reserved by Dr. Vish Hegde 3 From Work Package to Network WBS/Work Packages to Network ©All Rights Reserved by Dr. Vish Hegde 4
Background image of page 2
3 Example: East Bay Constructers The following table summarizes the major activities involved in a construction project. Activity Description
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 7

3110_Lecture_Ch06 - Project Management Instructor: Dr. Vish...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online