Project 8_Josh Nolan - JoshuaNolanWitteLawnEquipmentProject8

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Joshua Nolan Witte Lawn Equipment Projec Mower Production Planning Hours of Labor per Unit 32 40 55 Value of Material per Unit $128 $213 $543 Units to Manufacture 20 20 65 Total Hours for the Week 640 800 3,575 Total Value of Material for the Week $2,560 $4,250 $35,295 Electric Lawn  Mower Power Lawn  Mower Riding Garden  Tractor
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
ct 8 68 $650 Totals 17 122 1,185 6,200 $11,327 $53,432 Riding Lawn  Tractor
Background image of page 2
Microsoft Excel 14.0 Answer Report Worksheet: [Witte Lawn Equipment.xlsx]Mower Production Planning Report Created: 5/12/2011 10:29:18 AM Result: Solver found a solution. All Constraints and optimality conditions are satisfied. Solver Engine Engine: Simplex LP Solution Time: 0.015 Seconds. Iterations: 4 Subproblems: 0 Solver Options Max Time 100 sec, Iterations 100, Precision 0.000001 Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 5%, Solve Without Integer Constr Objective Cell (Max) Cell Name Original Value Final Value $F$8 Units to Manufacture Totals 0 120 Variable Cells
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 05/19/2011 for the course NETWORKING IT 273 taught by Professor Edwardswalcott during the Spring '11 term at Kaplan University.

Page1 / 7

Project 8_Josh Nolan - JoshuaNolanWitteLawnEquipmentProject8

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online