T Za Zb Zc 17.2 1.8 0.96 1.6 0.95 2.1 17.3 1.83 0.97 1.65 0.95 2.15 17.4 1.85 0.97 1.7 0.96 2.2 17.5 1.88 0.97 1.75 0.96 2.25 17.6 1.9 0.97 1.8 0.96 2.3 17.7 1.93 0.97 1.85 0.97 2.35 17.8 1.95 0.97 1.9 0.97 2.4 17.9 1.98 0.98 1.95 0.97 2.45 18 2 0.98 2 0.98 2.5 18.1 2.03 0.98 2.05 0.98 2.55 18.2 2.05 0.98 2.1 0.98 2.6 18.3 2.08 0.98 2.15 0.98 2.65 18.4 2.1 0.98 2.2 0.99 2.7 18.5 2.13 0.98 2.25 0.99 2.75 18.6 2.15 0.98 2.3 0.99 2.8 18.7 2.18 0.99 2.35 0.99 2.85 18.8 2.2 0.99 2.4 0.99 2.9 18.9 2.23 0.99 2.45 0.99 2.95 19 2.25 0.99 2.5 0.99 3 The project duration Smitty should include in the proposal should be a number between 18 to 18.1 weeks.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Prob that path A is completed before T Prob that path B is completed before T 0.98 0.89 0.98 0.9 0.99 0.91 0.99 0.92 0.99 0.93 0.99 0.93 0.99 0.94 0.99 0.94 0.99 0.95 0.99 0.95 1 0.96 1 0.96 1 0.97 1 0.97 1 0.97 1 0.97 1 0.98 1 0.98 1 0.98 Prob that path C is completed before T Prob that the project is completed before T...
View Full Document

This note was uploaded on 05/21/2011 for the course ISOM 111 taught by Professor Hu,inchi during the Spring '10 term at HKUST.

Page1 / 2

Solution for Time Please - Prob that path A is completed...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online