5837-21 - Mixer for preparation of patching materials Placement of patching material(HCC Finished patch(HCC Joint preparation(patch using PVA

Info iconThis preview shows pages 1–11. Sign up to view the full content.

View Full Document Right Arrow Icon
Photos from a Past Research Project on Partial Depth Repair of Airfield Concrete Pavement Scaling caused by combination of hydraulic fluid, lubricant and high heat from jet engines
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Photo of scaling on the concrete surface Photo of scaling on the concrete surface
Background image of page 2
Milling machine used to remove damaged concrete Milling machine in action
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Use of a jackhammer to remove damaged concrete Removing the broken concrete
Background image of page 4
Surface preparation – cleaning with water and compressed air
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 6
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 8
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 10
Background image of page 11
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Mixer for preparation of patching materials Placement of patching material (HCC) Finished patch (HCC) Joint preparation (patch using PVA concrete) Finished patch (using PVA concrete) Spraying of curing compound on a finished patch (Fondag) Curing of patch (Fondag) by ponding Placement of aggregate before application of binder (ASR-1) Finished patch (ASR-1) Finished patch (Phoscrete) Finished patch (phoscrete) Finished patch (Set-45)...
View Full Document

This note was uploaded on 05/26/2011 for the course TTE 5837 taught by Professor Staff during the Spring '11 term at University of Florida.

Page1 / 11

5837-21 - Mixer for preparation of patching materials Placement of patching material(HCC Finished patch(HCC Joint preparation(patch using PVA

This preview shows document pages 1 - 11. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online